Entering the mining marketing more than 30 years ago, we have developed a reputation with our mining clients for safety processes and highly skilled, multidiscipline craft. Our dedicated craft following allows us to work in the remote locations of many mining projects, without sacrificing the quality of our team. We have served all aspects of the mining and minerals industry from some of the world’s largest primary and precious metals projects to coal, oil shale, soda ash and other industrial minerals.
TIC was awarded the contract for the installation of a new 60” silo feed conveyor, a 72” transfer conveyor and train batch loadout system.
TIC was awarded the contract for the construction of a 1,200 TPH rock processing plant.
TIC was awarded the contract for the coal crushing, handling, storage and train loadout system.
TIC was awarded the contract for the electrical and instrumentation of the Molybdenum Autoclave system at Kennecott Utah Copper facility.
TIC was awarded the contract for the complete mechanical installations for Holnam’s Devil Slide Project that included a production line capacity increase from 1,100 STPD to 2,100 STPD of clinker.
TIC was awarded the contract for the construction of two new 7,000 TPH batch loadouts and a coal drying and treatment system that is unique in Powder River Basin mining operations.
TIC was awarded the contract for the installation of a truck wash, conveyors and silo for bulk sulfur.
TIC was the general contractor of a 36,000 TPD gold mill in the heart of Alaska, utilizing conventional crushing, grinding, CIL leaching, carbon stripping and electrolytic recovery process.
TIC was awarded the contract for engineering, construction and procurement JV with Roberts & Schaefer. Scope of work consisted of surface expansion that included a new 2,000 TPH facility comprised of storage, screening, crushing, sampling and automated truck loading.
TIC was the general contractor for the installation of 10 miles of conveyor system including all associated concrete, structural, mechanical and E&I. TIC installed overland conveyor on 18% and 16% grades. This required careful precautions and best practices to keep the work safe.
10055 Trainstation Circle
Lone Tree, Colorado 80124
720-920-4200
833-281-5273