Header_06.jpg
TIC
Hide Search Field
Show Search Field

Tenneco Soda Ash Expansion

Tenneco Soda Ash Expansion - Green River, Wyo.

TIC was the EPC contractor for the construction of Tenneco’s (Solvay Minerals) Soda Ash Expansion project for Kvaerner Davy (Davy McKee) Corporation.

Technical Details

  • „Moving all instruments and controls for two (2) calciner and dryer lines from an existing Foxboro 200 system to a new Honeywell TDC 3000 system
  • „Transferring of 1,800 loops from existing control room without major outages
  • Installation of one 14’x6” x 110’ Fuller rotary kiln and one Fuller gas-fired dryer
  • 4,800 lf of belt conveyors
  • Two (2) 4,500 hp vapor compressors, two ABB ESPs, two crystallizers and two hammer mills/drag conveyors
  • 54,000 lf of process pipe
  • 17,000 cy of concrete
  • 3,628 tons of structural steel
Quick Links
Featured Projects
LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.
Contact Kiewit

Home Office : 3555 Farnam St. Omaha, NE

Home Office : (402) 342-2052

General Info : [email protected]

Locations Page   |   Career Search

Featured Projects

LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.

Contact TIC

Home Office :

10055 Trainstation Circle
Lone Tree, Colorado 80124
 

 

Office : 

720-920-4200

 

Jobs Hotline : 

833-281-5273

 

Locations Page   |   Careers