From simple-cycle peaking plants to complex combined-cycle facilities, our total-project execution capabilities encompass various configurations and feature aeroderivative and advanced turbine installations. We continue to provide our clients the custom solutions they seek in response to continually changing demands of today’s market.
In a joint venture,TIC with Kiewit Power Engineers, was the EPC contractor for a 620 MW 2x1 combined cycle gas fired power plant.
In a joint venture, TIC with Kiewit Power Engineers was the EPC contractor for a 250 MW gas fired power plant.
In a joint venture the TIC - The Industrial Company and Kiewit Power Engineers team was the EPC contractor for a 950 MW combined cycle gas fired power plant.
TIC, in a joint venture with Kiewit Power Engineers, was the EPC contractor for a 250 MW combined cycle power plant.
TIC was the general contractor for the design and construction of a 4 x 1, a 1,200 MW combined cycle power plant.
General contractor for a 500 MW 2x1 combined cycle power project.
TIC was the EPC contractor providing construction services for the 200 MW peaking facility.
The project is located adjacent to the existing Antelope Station, Elk Station Unit 1, Elk Switchyard and the Sharyland switchyard transmission line. Project scope includes engineering, procurement, construction and start up of two 190-megawatt simple-cycle gas combustion turbine electrical generation facilities. The power plant will use two General Electric 7FA.05 combustion turbine generators.